Privacy and cookies

We use cookies and your data to improve and personalize the services on our website. Read more

Replacement and renovation of the rolling mill line at Karmøy

Replacement and renovation of the rolling mill line at Karmøy

- We had three weeks to replace machinery at the rolling mill. Several companies worked together to accomplish this. Servi Group delivered as expected1. We have already ordered Servi Group to assist with a new extensive job next year, says Simon G. Langåker, project manager for Speira, Karmøy

Bergen Port: A more flexible gangway and less noise and power consumption on the generator

Bergen Port: A more flexible gangway and less noise and power consumption on the generator

- Servi Group has made several improvements to our gangway at Bergen Port. In total, we save both time, electricity and can operate more environmentally friendly. The generator no longer makes noise and we use less electricity. The gangway, which was previously fixed, is now more flexible. With installed cylinders, we can connect it to the ship in 2 minutes. Before, it took us significantly longer. - Egil Johansen, Operations Manager Construction & Civil Engineering, Bergen Port.

Hydraulic unit upgrade on Mooring system

Hydraulic unit upgrade on Mooring system

The Hydraulic unit upgrad is used for RAM-/PULL-IN winch - for placement/tightening of anchor chains. The winches are supplied by McGregor to the FPSO.

Another successful FAT (Factory Acceptance Test) in Kongsberg with Seasystems

Another successful FAT (Factory Acceptance Test) in Kongsberg with Seasystems

A successful FAT is essential to ensure that the integrated hydraulic system works as intended. The hydraulic system, ordered by Seasystems, will be used to pull in and secure anchor chains on an FPSO mooring vessel* in Brazil.

Complete delivery on the upgrade of existing facilities for Statkraft Suldal Dam

Complete delivery on the upgrade of existing facilities for Statkraft Suldal Dam

- Servi has delivered good work with the project at Osvad, taking on challenges with ease. The end result has been very good, with a tidy installation and satisfactory function of the lifting mechanism. Helge Steinbru Lauvsnes, Statkraft Suldal dam

Rapid replacement of the cylinder rod resulted in minimal downtime

Rapid replacement of the cylinder rod resulted in minimal downtime

- Servi, originally known as Servi Cylinderservice, utilized the original drawings to manufacture a new cylinder rod during the summer holiday. Access to the original drawings ensured minimal downtime for the hatch – without them, we could have faced a month of downtime. - Geir Åsbjørn Ovedal, VTA at Sira Kvina Power Company

Servi extends hydraulic life on production vessel Åsgard A

Servi extends hydraulic life on production vessel Åsgard A

- With the robustness of this critical system, we are much better equipped to meet the winter storms, and maintain stable and safe operations on Åsgard A," says Planning and Maintenance Manager (PV manager) on Åsgard A, Svein Erik Lien, about the maintenance job Servi Group has performed on the ship in 2022.

UPTIME - hydraulic system for wave-compensated gangways

UPTIME - hydraulic system for wave-compensated gangways

UPTIME is a leading player in offshore wind logistics solutions. The hydraulic systems from Servi will Uptime use for walkways for person and goods transport between ships and offshore installations. This is also known as the Walk to Work (W2W) system.

24/7 Service - T +47 64 97 97 00
Subscribe to news and product info from Servi

Stay up to date on your field of interest. Sign up for our email list!

Copyright © 2024 Servi Group. All right reserved