Complete delivery on the upgrade of existing facilities for Statkraft Suldal Dam

Complete delivery on the upgrade of existing facilities for Statkraft Suldal Dam

- Servi has delivered good work with the project at Osvad, taking on challenges with ease. The end result has been very good, with a tidy installation and satisfactory function of the lifting mechanism. Helge Steinbru Lauvsnes, Statkraft Suldal dam

FACT
  • Industry: Hydropower
  • Owner: Statkraft
  • Delivery: Upgrade project on existing facilities with a combination of new cylinders, HPU, dismantling of old + assembly of new equipment.
  • When: 2022
  • Delivered by: Servi Group SLS (Servi Lifecycle Services)

Due to wear and tear, it was time for an upgrade of the facility at the Suldal Dam hydroelectric power plant.

Servi, Sandnes department, received the entire contract, covering everything from product manufacturing to road closure and traffic control while the upgrade work was underway..

What did the assignment consist of?

  • Dismantling of old equipment
  • Cylinder for 3 gatehouses
  • Hydraulic Power Unit (HPU) with a control cabinet in each
  • Replaced bearings and bolts (with grease) in the dam gates
  • Assembly of new equipment

 

Montering av HPU og sylinder i Suldal Dam

From the assembly of the hydraulic unit and cylinder at the Suldal Dam hydroelectric power plant.

 

Read about our deliveries within hydropower

 

Contact Us: For components, service, or systems related to hydropower



24/7 Service - T +47 64 97 97 00
Subscribe to news and product info from Servi

Stay up to date on your field of interest. Sign up for our email list!

Copyright © 2024 Servi Group. All right reserved